Reinforced concrete formwork for a box culvert on a port access road
← Full portfolio

PRJ-014 · Civil & Drainage

Apapa Port Access Culvert

CLIENT
Contracted via Apapa Port Authority
LOCATION
Apapa, Lagos State
DATE
2025-08-01
SCOPE
Box culvert design, storm drainage tie-in, heavy-axle load rating

Container traffic into Apapa had been backing up onto a flood-prone access road every rainy season. We designed and built a reinforced box culvert rated for sustained heavy-axle loads, tied into the existing storm drainage network, and sequenced construction around live port traffic.

BEFORE / AFTER

BEFORE AFTER
Access road, before culvert works and after resurfacing.

TIME-LAPSE

Six weeks of culvert construction, condensed.

IMAGE GALLERY

CASE STUDY · PDF

Apapa Port Access Culvert — full write-up

Download · 2 KB