- CLIENT
- Contracted via Apapa Port Authority
- LOCATION
- Apapa, Lagos State
- DATE
- 2025-08-01
- SCOPE
- Box culvert design, storm drainage tie-in, heavy-axle load rating
Container traffic into Apapa had been backing up onto a flood-prone access road every rainy season. We designed and built a reinforced box culvert rated for sustained heavy-axle loads, tied into the existing storm drainage network, and sequenced construction around live port traffic.
BEFORE / AFTER
TIME-LAPSE
IMAGE GALLERY
CASE STUDY · PDF
Apapa Port Access Culvert — full write-up