Skip to content
Dalorts
ENG.
Services
Projects
Media
About
Request a quote
Toggle menu
Services
Projects
Media
About
Request a quote
MEDIA LIBRARY
The full media set
28 items, drawn from every catalogued project — browsable on its own, independent of the portfolio.
All media
Video
Photo
All disciplines
Structural Engineering
Civil & Site Works
Mechanical & MEP
Power & Energy Systems
Industrial Fabrication
Project Supervision & QA
Rooftop solar array installation in progress.
Panel mounting rail alignment.
Hybrid inverter bank commissioning.
Completed array viewed from the adjacent tower.
VIDEO
Panel installation across four days, condensed.
Refrigeration units installed along the cold-storage envelope.
Insulated panel wall assembly in progress.
Backup power transfer switch installation.
Completed cold-storage racking bay.
VIDEO
Walkthrough of the completed cold-storage fit-out.
Switchgear bay mid-upgrade, Lekki 11kV substation.
New 11kV switchgear panel prior to commissioning.
Transformer bank lift and placement.
Protection relay testing during commissioning.
VIDEO
Walkthrough of the upgraded switchgear bay.
Box culvert formwork ahead of the pour.
Rebar cage placement inside the culvert formwork.
Storm drain tie-in at the culvert headwall.
Completed access road surface over the culvert.
VIDEO
Six weeks of culvert construction, condensed.
Steel frame erection at the new fabrication hall.
Overhead crane rail alignment check.
Welding bay layout inside the completed hall.
Dust extraction ducting run along the roof trusses.
Bulk earthworks grading a building pad.
Internal road sub-base compaction.
Perimeter drainage channel lining.
Survey markers set out across the graded site.