PRJ-011 · Power & Energy

Lekki Distribution Substation Upgrade

CLIENT
Eko Distribution Company
LOCATION
Lekki, Lagos State
DATE
2025-11-01
SCOPE
11kV switchgear replacement, transformer upgrade, protection relay commissioning

Eko Distribution Company needed to lift capacity on an ageing 11kV substation feeding a fast-growing stretch of the Lekki corridor without extending the outage window past a single weekend. We replaced the switchgear, upgraded the transformer bank, and re-commissioned protection relays with a phased cutover plan that kept feeders live through the swap.

Walkthrough of the upgraded switchgear bay.

BEFORE / AFTER

BEFORE AFTER
Switchgear bay, before replacement and after commissioning.

IMAGE GALLERY

CASE STUDY · PDF

Lekki Distribution Substation Upgrade — full write-up

Download · 2 KB