- CLIENT
- Gateway Industrial Estates
- LOCATION
- Agbara, Ogun State
- DATE
- 2025-02-01
- SCOPE
- Bulk earthworks, internal road network, perimeter drainage
Gateway Industrial Estates needed a 40-hectare parcel graded and serviced before tenant construction could begin. We ran bulk earthworks to level building pads, laid out the internal road network to the estate’s heavy-vehicle turning circles, and built perimeter drainage rated for the site’s clay soils.
IMAGE GALLERY
CASE STUDY · PDF
Ogun Industrial Park Site Works — full write-up